시험번호: 646-228

시험이름: Lifecycle Services Advanced IP Communications(LSAIPC)
Q&A: 55 Q&As
가격(달러):  29.00 USD
업그레이트: Jan-15-2010
시험문제:
1. The staff training template is one of the templates and/or tools identified as essential for the informal
advanced training for administration and operations activity during the implement phase. What is the
other resource that is used to accomplish this activity?
A. Lessons Learned template
B. IPC Project Plan
C. Phone Deployment Kit
D. System Requirements Validation Report
E. As Built Documentation
Answer: E
2. Which template is used to define the specifics of a flash or phased implementation strategy?
A. Business Requirements Document
B. Network Implementation Plan
C. High Level Design
D. IPC Project Plan
E. Optimization Report
F. Installation Guide
Answer: B
3. In the optimize phase, the call processing assessment activity contains the establish call volume
baselining task. Which template or tool documents the call volumes?
A. Bridge Traffic Analyzer
B. Microsoft Performance and Event Monitor
C. Operational Assessment Checklist
D. Continuous Improvement Plan
E. CDR Analysis and Reporting Tool
Answer: E
4. Which two are phases of a project life cycle? (Choose two.)
A. Plan
B. Business Requirements Definition
C. Network Readiness Assessment
D. Operational Readiness Assessment
E. Design
Answer: AE
5. Within the prepare phase, which two tasks are required to begin the prepare for business requirements
workshop activity? (Choose two.)
A. Document User-Level Functionality Requirements
B. Document Vertical Business Initiatives Requirements
C. Identify key stakeholders for the Business Requirements Development Workshop
D. Conduct a Solution Value Assessment
E. Send Invitations
F. Document Corporate Business Initiatives Requirements
Answer: CE